A long repair list, sorted into what burns, what leaks and what can wait

Get a staged plan

The three stages

Every staged plan we write keeps the same order. It follows the risk to the house and the people in it, not the size of each job.

  • Stage one, before the next fire: cracked or missing flue tile, a stove with no liner or the wrong one, clearance trouble at the mantel or wall, a chimney top with no spark screen.
  • Stage two, before the rains: leaks at the flashing, a cracked crown, water piling behind a wide stack, open mortar joints.
  • Stage three, when you are ready: a better appliance, such as an insert in place of an open hearth, or finish work on the face and hearth.

Stage one: keep the fire where it belongs

For a house that burns every winter, stage one is not optional. A cracked flue lets heat find the studs and joists next to the stack. A stove vented into an oversized clay flue builds hard glaze fast. A chimney top with no screen sends embers onto a roof that has dried out all summer, and with Santa Ana winds in the fall that is the item we press hardest. Until stage one is done, our advice is to leave the stove cold.

Most stage one work comes down to a liner, a cap or both. The cap is quoted on site. The liner gets its own written figure once the camera has measured the flue.

Stage two: stop the water

Water does slow, quiet damage. It softens mortar, rusts dampers and stove connectors, and marks ceilings. Mission Viejo gets its rain in a handful of heavy storms, so a leak can sit unnoticed from spring until the next wet winter.

Leak tracing and repair has a published range, and so do crickets for chimneys wide enough to catch runoff on the uphill side. Crown and flashing work without a cricket has no set price; you get a figure on paper from the roof visit.

Stage three: the upgrade

Many owners use the plan to decide what the fireplace becomes. Some keep wood and add an insert. Some go to gas so the fireplace still works on no-burn days. Our gas insert range is listed below; wood inserts are priced once you pick a unit.

Nothing in stage three is needed to use the chimney safely. It sits at the end of the list so it never crowds out the safety work.

Prices for common staged jobs

Work that turns up on most plans and carries a set range. Anything else on your list gets a written figure.

Camera survey that builds the plan
$380
Finding and fixing a roofline leak
$540 to $3,250
Water diverter on the high side
$430 to $975
Diverter plus a complete reflash
$650 to $1,600
Gas firebox fitted into existing masonry
$2,700 to $5,400
Spark-screened top for the flue
Quoted after we measure

Liners, crowns, dampers and chase covers have no set price; each gets a written figure from the inspection.

Staged repair questions

Can I burn while stage two is still open?

Usually, yes. Stage two is about water, not fire. If a leak has reached the firebox or the damper, the plan says so in plain words.

We have findings from another inspector. Can you plan from them?

Often. We read them, check the items that matter on site and build the stages from there. If a line needs the camera to confirm, we say that before pricing it.

Does stage one always mean a liner?

No. Some chimneys clear stage one with a cap and a sweep. The camera decides.

Can another contractor take part of the plan?

Yes. The plan is yours. Each stage is written so another contractor could price it as well.

Do the prices hold between stages?

Our published ranges are the ones we use for every stage. Written figures for unpublished items say how long they stand.

Turn a long list into a plan

Use the contact page to share the findings you have, or to book the camera survey that builds the plan.